20190425_100047.jpg

 Recent Projects

a2fac6c2-6d27-4e83-befa-45f9c85d1003_edi

Entire common areas and a pool/Jacuzzi deck redo, including a demo, waterproofing deck and planters, coping, overlay, building entrance, stucco, railing, and paint up to the first joint. 

IMG_20200129_091210_edited.jpg

New construction of common areas - lobby, gym, meeting room, receptionist, pool deck, balconies. (AMCAL and CAS)

WhatsApp Image 2019-02-12 at 4.00.53 PM.

Complete remodeling of a 264-unit building’s common areas, including a new gym, yoga room, high-end lobby, Title 24, building painting, railings, complete pool deck renovation, pool house, playroom, theater room, waterproofing an 8,000 Sq. ft. of pool-deck, stucco, interior paint, BBQ and entertainment areas, much more.

Twelve high-end French-style four-story high townhomes, complete exterior renovation of all custom Pella sliding doors, waterproofing 9,000 SF flooring and balconies, and re-installation of a natural stone floor finish.

Pass%20Through_edited.jpg

Twenty-five-story high-rise located in West Hollywood. Complete renovation of the clubhouse, kitchen, and bathrooms, installing low voltage, EMP, windows/sliding doors, drywall, pool, and waterproofing of the entire pool deck, with an astonishing outdoor seating area. 

20200420_133657.jpg

Three large, mid-size buildings on the Santa Monica shore.  Re-coat of 26,000 SF corridors in order to provide an extended warranty.    

WhatsApp Image 2019-02-19 at 9.18.08 AM(

Century Park Place is a six mid-rise building HOA with 416 condos. CAS has renovated many common areas throughout the buildings, including lobby renovations, courtyards, corridors, gazebos, pool decks, fencing around the property, and much more. 

44.jpg

A seven-apartment building Alura property at 6333 Canoga ac., Woodland hills.

 Reinforcing two-story buildings with 36 bays, footing, grade beams, moment frames, stucco, and paint. 

Passed all inspections. 

Caesarstone Los Angeles

640 N. Sepulveda, LA. Complete building remodeling, Title 24, multi-office renovation (T.I), metal structures, windows, doors, railing, painting, 14,000 SF waterproofing, and decorative stencil cement overlay.

WhatsApp Image 2018-11-15 at 2.18.55 PM(

Large 250-unit building renovation, including a complete pool deck and common area repair. About 8,500 SF waterproofing and custom flooring, with a complete pool and spa renovation. 

LIVING_NOHO_14.jpg

“Imperia” 11039 McCormick, North Hollywood.

 Remodeling common areas of three buildings six stories high: waterproofed balconies, computer room, lounge, exterior paint, and complete pool deck waterproofing, which included platers, sloping and overlay, drain replacement, metal railings, and more.

WhatsApp Image 2020-01-03 at 12.39.55 PM

Three offices T.I and railing throughout. 

Copyright © 2016 CAS Building Specialists